Tuesday 28 April 2015



a bit more welding, fit the exhaust and sort out the cable routing etc
stand , engine and front wheel clearances are all good .
nearly ready for paint .....


a beautiful thing


inlet all done
could go wider but its not going to be a complete monster so .....

dry build on the motor reed block and carb ` just .........
the wide mount project

Sunday 26 April 2015

dom outside his workshop
with his new pride
disc brake, reed valve etc all to come ....
simon 152l2
summer in the workshop
the wide mount badges
now for restoration .....


chris, v range guard on pk forks, more cutting  and shaping , but nearly


the tank now dry fitted, 17ltr , the sx, the front end next







scots motor, nearly all ported , now with reed ` 28 flat slide carb, this will be fun trying to fit this into the old wide mount ......

Wednesday 22 April 2015


doms
little rusteration 50, well not quite
inches away from fin

Monday 20 April 2015




moses seat
all new covering mmmm



after the blue is added
the bike is wrapped in black bags, more paint is added and then again sanded
next up we lacquer .....


the little silver 50
finds a new home
first lots of sanding , grey primer, red oxide and then lagoona blue




new studs now added to the wide mount
and a couple of lucky finds for the springs to sit on ;]

Wednesday 15 April 2015



to this
simons 152l2 



from this ....

Saturday 11 April 2015



the spanish wide mount ....
another dry build .........
i will see it in paint eventually - not forgetting the client scott . hope your back up on your feet very soon pal. cream paint , satin black powder coat ad a little accent of chrome. the motor thus far 180cc and a race crank - more porting , 28 carb and reed block ?

nb - as a side note this bike is probably one of the most  time conssumig projects I have ever built.

in the vey near future it will be in its new coat , even if it tries to

a really torquy pipe than doesn't rev past 9 grand .........
on the shopping list ......... more time .......... more parts ...... ;]p

above - gs 150 main stand now fitted ....mmmm kind of
more cutting more welding

below , unfortunately some one cut of frame pins for the saddle seat ........ great !











the serveta, creative times .....

all done - variable ignition now fitted





the serveta , new brakes , the pot needs to go 



Thursday 9 April 2015



the little 50 moves forward. waiting on the crank .....


sx forks, dry build - austrian progressive springs, stainless fork link bolts and billet dampers.
weld damper brackets on , strip again and then of to the powder coaters


twins ...

Tuesday 7 April 2015


horn cast arrives serveta

lambretta toys

at long last
the disc brake arrives for the spanish wide mount ;]

seats return for the vbb
all newly upholstered

Monday 6 April 2015



saturday afternoon.
the little 50 , on legs

Friday 3 April 2015



today at the workshop.
the serveta moves on.
a way to go. restoration or rusteration ?

parts arrive for the serveta
thanks buzz

new project
serveta 125
dragged out of a shed , seized back wheel - nice - thought the hub extractor was going to explode !


the sx
moves on , headset top back from strippers, also the headlight ring. now for powder coat then paint.
frame now filled and primed