Thursday 31 October 2013

the gas
simons vbb, the gas bike returns after a long wait , lots of laquer ;]
rods vbb, detail shot

Monday 28 October 2013

front disc brake, dry build rods vbb
detail of texture, rods vbb
chemicals and some rain, rods vbb , nearly ready for laquer

Saturday 26 October 2013

as suggested by nadine this didnt come out of the canal, but with a bit of time, patience and love ....
watch this space

Friday 25 October 2013

stevens smallie, hydraulic cut and welded , cables and loom gone, ready to blast , bare metal, graphics
and laquer comin up
rods vbb returns from the blaster, super straight, rust , flames and laquer coming up
rods motor nearly done, t5 172

roberts bike all done , city tune all good

Friday 18 October 2013

red oxide and blue mmmmmm simons vbb - back from the painter next week , piks to follow ;]
simons vbb gets a long over due strip paint and laquer

Monday 14 October 2013

thanks mikie ;]
chris,s bike arrives back in the workshop, welding, blasting and powder coating all done.
much cutting and shaping for the disc brake conversion and a shortened bitubo front shock.

Wednesday 9 October 2013

roberts et3 gets a long over due motor rebuild, city tune

Tuesday 8 October 2013

rods vbb back from the panel beater. it sits outside my nearly but not quite ready workshop
after a sand blast, the chrome has almost disappeared , interesting , powder coat or laquer mmmm

Monday 7 October 2013

a bit of masking tape, some metal tube and a bit of imagination ;]
at steves request, the panel is cut of to expose the engine, the carb manifold also turned cut and welded.
next up cross bars on the inside of the frame
the vbb gets a master cylinder after a bit of welding, cutting and filing.
note the burnt paint on the headset, think we might have to keep that
phase one, rods vbb gets stripped, t5 motor, disc brake etc coming up